LK166
Home >> Supply >> A2NCPUR21 | MITSUBISHI CPU unit A2NCPUR21
Search
Information sort

A2NCPUR21 | MITSUBISHI CPU unit A2NCPUR21


10BASE5.
For Q mode.
Control layer /MELSECNET/10 (H) is the middle layer of the whole network system,
Control network which is convenient and high speed processing data transmission between PLC, CNC and other control equipment.
As MELSEC control network MELSECNET/10,
With its good real-time performance, simple network settings, no procedures of the network data sharing concept,
As well as the redundant circuit and so on, has obtained the very high market appraisal,
The number of devices to reach the highest in japan,
In the world is also one of the few A2NCPUR21 A2NCPUR21.
And MELSECNET/H not only inherited the excellent characteristics of MELSECNET/10,
Also makes the network real-time better, more data capacity,
Further adapt to the needs of the market MITSUBISHI A2NCPUR21. Series Name: A985GOT A2NCPUR21.
Size: 12 inches.
Resolution: 800 * 600.
Display equipment: high brightness TFT color display.
Display color: 256 color.
Power supply: AC100-240V.
Authentication: UL/cUL/CE MITSUBISHI A2NCPUR21.
Man machine interface (Machine Interaction Human, referred to as HMI), also known as the user interface or user interface,
Is a communication interface between human and computer,
Is an important part of the computer system.
Is a medium for interaction and information exchange between the system and the user,
It realizes the transformation between the internal form of information and the acceptable form of human being MITSUBISHI A2NCPUR21.
Where there is a man-machine interface in the field of human computer information exchange. Can connect the transmitter units 2 units using radius of about 50 meters (outdoor 200 meters).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wwrong operation of the system A2NCPUR21.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..

Related supply information