LK166
Home >> Supply >> AJ35PTF-28DS | MITSUBISHI DC input / silicon controlled output module AJ35PTF-28DS
Search
Information sort

AJ35PTF-28DS | MITSUBISHI DC input / silicon controlled output module AJ35PTF-28DS


8 slots.
Power supply unit.
QnAS series unit installation.
High speed access.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest AJ35PTF-28DS.
The input and output points and types of PLC should be deteermined according to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point AJ35PTF-28DS.
Taking into account the future adjustment and expansion,
In general should be estimated on the total number of points plus the amount of spare 20%~30%.
When the programmer input programinto the user program memory,
Then CPU according to the function of the system (the system program memory to explain the compiler),
Translate the user program into PLC internally recognized by the user to compile the program AJ35PTF-28DS MITSUBISHI AJ35PTF-28DS.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage MITSUBISHI AJ35PTF-28DS.
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load MITSUBISHI AJ35PTF-28DS.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action. A set of 5 (LOGO removable, man-machine interface provides one).
Applicable model: A975/970GOT (-B). AC input points: 32 points.
Input voltage and current: AC100 ~ 10mA, 120V.
Response time: 35ms.
16 point /1 a public side.
Bidirectional thyristor output points: 24 points.
Output voltage and current: AC100 ~ 240V, 0.6A/1 point, 2.4A/1 public end.
Response time: 0.5Hz1ms.
8 point /1 a public end, 4 point /1 a public end.
36 point terminal table * 2.
Number of stations: 8 stops.
Compact remote I/O unit.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently iin any place of the world,
Build a remote monitoring management system AJ35PTF-28DS.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information.

Related supply information