LK166
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A975GOT-TBA-CH User's Manual (Hardware) PDF

MITSUBISHI A975GOT-TBA-CH User's Manual (Hardware) PDF

Brand: MITSUBISHI
Product model: A975GOT-TBA-CH
Name: touch screen
Sort: User's Manual (Hardware)
File language: English
File size: 0.85MB
Input points: 16 points.
Voltage: DC5/12/24V.
Current: 5.5/3/6mA.
Response time: 3ms.
8 points / a common end.
Positive / negative sharing.
20 point terminal station A975GOT-TBA-CH PDF.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read A975GOT-TBA-CH
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program A975GOT-TBA-CH PDF.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i A975GOT-TBA-CH PDF. e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference MITSUBISHI User's Manual A975GOT-TBA-CH Manual. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation MITSUBISHI User's Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear. QnA/ACPU bus connection MITSUBISHI User's Manual.
1 joint.
Applicable models: A985 (-V) /975/970/960GOT. Twisted pair cable.
Single bus.
MELSECNET/B (remote I/O station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. Affter MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A975GOT-TBA-CH User's Manual.
The main contents of the initialization program arre: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A975GOT-TBA-CH Manual. .