LK166
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A975GOT-TBD-CH User's Manual (SW4D5C-GOTR-PACKE compatible Connection System Manual) PDF

MITSUBISHI A975GOT-TBD-CH User's Manual (SW4D5C-GOTR-PACKE compatible Connection System Manual) PDF

Brand: MITSUBISHI
Product model: A975GOT-TBD-CH
Name: touch screen
Sort: User's Manual (SW4D5C-GOTR-PACKE compatible Connection System Manual)
File language: English
File size: 2.74MB
32 point connector for compression connector (37 pin D-sub connector).16 channels.
Thermocouple input.
38 point terminal station.
How to determine the input / output device of MITSUBISHI plc A975GOT-TBD-CH PDF.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points A975GOT-TBD-CH
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book A975GOT-TBD-CH PDF A975GOT-TBD-CH Manual. Input voltage range: AC100 ~ 120V.
Output voltage: DC24V.
Output current: 0.6A.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage A975GOT-TBD-CH PDF.
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load MITSUBISHI User's Manual.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action.
I/O points is an important indicator of PLC MITSUBISHI User's Manual.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest.
The input and output points and types of PLC should be determined according to the analog quantity annd switch quantity of the controlled object,
Generally an input / output element to take up an input / output point MITSUBISHI User's Manual A975GOT-TBD-CH User's Manual.
Taking into account the future adjustment and expansion,
In general should be estimaated on the total number of points plus the amount of spare 20%~30% A975GOT-TBD-CH Manual.
The following describes the centralized control system I/O points of the estimate.
Related products