LK166
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A985GOT-TBA User's Manual (Hardware) PDF

MITSUBISHI A985GOT-TBA User's Manual (Hardware) PDF

Brand: MITSUBISHI
Product model: A985GOT-TBA
Name: Graphic Operation Terminal
Sort: User's Manual (Hardware)
File language: English
File size: 0.67MB
32: terminal line adapter 0.3mm2 (AGW22).3C-2V/5C-2V coaxial cable.
Double circuit.
MELSECNET (II) (remote I/O station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program A985GOT-TBA PDF.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system A985GOT-TBA
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A985GOT-TBA PDF.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc.. For A6TBXE/A6TBY36E/A6TBX54E/A6TBY54E/A6TBX70E (common cathode; source) long 0 A985GOT-TBA PDF. 5m.RS-422 1 channel.
Transfer speed: 19.2/38.4bps.
AJ71C22-S1/A0J2-C214-S1 connection.
Input and output module connected with A0J2.
How to determine the input / output device of MITSUBISHI plc.
According to the ccontrol requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points MITSUBISHI User's Manual A985GOT-TBA Manual.
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book MITSUBISHI User's Manual. SI-200/250 fiber optic cable.
Double loop.
MELSECNET (II) (Master / local station) MITSUBISHI User's Manual.
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc..
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps.
Design PLC peeripheral hardware circuit A985GOT-TBA User's Manual.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc..
The electrical schematic diagram of the system compoosed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram A985GOT-TBA Manual.
So far the system''s hardware electrical circuit has been determined.
Related products