MITSUBISHI A273UCPU cpu module

Brand: MITSUBISHI
Name: cpu module
Model: A273UCPU

2 slots.
To install the power supply.
For QnA/A series.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order MITSUBISHI A273UCPU.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic A273UCPU
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read MITSUBISHI A273UCPU.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions MITSUBISHI A273UCPU.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear. Cable 1.2m for the expansion of the floor, the expansion of a floor for every 1 units.Input voltage range: DC110V.
Output voltage: DC5V.
Output current: 8A.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest.
The input and output points and types of PLC should be determiined according to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point A273UCPU.
Taking into account the future adjustment and expansion,
In general should be estimaated on the total number of points plus the amount of spare 20%~30% A273UCPU.
The following describes the centralized control system I/O points of the estimate.