LK166
Home >> Download >> MITSUBISHI >> Catalog Download >> MITSUBISHI A32RB datasheet PDF

MITSUBISHI A32RB datasheet PDF

Brand: MITSUBISHI
Product model: A32RB
Name: floor
Sort: PDF datasheet
File language: English
File size: 2.54MB
CPU-A8UPU/A8PUJ connection.2 slots.
Can be installed in the power supply unit for A series units installed QnA/.
When the programmer input programinto the user program memory,
Then CPU according to the function of the system (the system program memory to explain the compiler),
Translate the user program into PLC internally recognized by the user to compile the program A32RB PDF.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage A32RB
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load A32RB PDF.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest A32RB PDF.
The input and output points and types of PLC should be determined according to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point.
Taking into account the future adjustment and expansion,
In general should be estimated on the total number of points plus the amount of spare 20%~30%.
The following describes the centralized control system I/O points of the estimate. Control axis number: 2 axes (independent, straight line arc interpolation at the same time)
Number of stations: 4 stops.
Station type: intelligent equipment station.
Configuration of master / local station,
In addition to the other site network with different CC-Link in addition to the main station and the remote station configuration can also be the main station and the local station configuration.
A local PLC can communicate with the master station PLC and other remote workstations.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the oon-line unification to adjust A32RB datasheet.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step A32RB datasheet.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
Related products
MITSUBISHI
floor
A35B
MITSUBISHI floor A35B
5 slots. Can e installed in the power supply
MITSUBISHI
CPU unit
A3NCPUP21
MITSUBISHI CPU unit A3NCPUP21
Input and output points: 2048 points. Input /
MITSUBISHI
CPU unit
A3NCPU
MITSUBISHI CPU unit A3NCPU
Input and output points: 2048 points. Input /