LK166
Home >> Supply >> Q1MEM-2MS Memory card MITSUBISHI Q1MEM-2MS
Search
Information sort

Q1MEM-2MS Memory card MITSUBISHI Q1MEM-2MS


Input points: servo external signal 32 points, 8 axis.
Input mode: source / drain type.
Input and output points: 32 points.
Convenient processing of large capacity data.
In the past can not achieve the standard RAM and SRAM card file register area of continuous access,
The boundary of each area should be considered in programming Q1MEM-2MS.
The SRAM 8MB extension card is installed in the high speed universal QCPU,
Standard RAM can be used as a continuous file register,
Capacity up to 4736K words, thus simplifying the programming Q1MEM-2MS.
Thus, even if the memory space of the soft element is insufficient,
Can also be installed by the expansion of SRAM card, easy to extend the file register area.
The address register is extended to 32 bits, which can be programmed to go beyond the traditional 32K word,
And to achieve the extension to the file register to all regions of the file register Q1MEM-2MS.
In addition, the processing speed of the index modification plays an important role in the efficient operation of structured data (array),
The speed has been improved MITSUBISHI Q1MEM-2MS.
When the index is used to modify the program repeatedly (e.g. from FOR to NEXT), the scan time can be reduced.Adapter for mounting DIN guide rail.
For Q32SB, Q33SB, Q35SB, Q33B, Q52B, Q55B, Q63B.
SRAM memory card.
RAM capacity: 2MB. Measurement items: leakage current (Io), resistive leakage current (Ior) MITSUBISHI Q1MEM-2MS.
Measuring circuit number: 2 circuits.
Insulation monitoring module for measuring leakage current.
Leakage current can be measured to ensure safety by monitoring the leakage current (Io), can detect the risk of electric shock.
Insulation state measurement of resistive leakage current (Ior) can be monitored continuously and continuously,
In order to continuously monitor the insulation aging status of the equipment MITSUBISHI Q1MEM-2MS.
Each measurement project can be carried out in the 2 phase of the alarm monitoring can be respectively on the leakage current (Io), resistive leakage current (Ior) for the 2 phase of the alarm monitoring,
No ladder diagram program. Alarm monitoring is divided into 2 stages of attention alarm and danger alarm.
A module can measure two circuits of aa module can be two circuits on the same line in the same system type power measurement Q1MEM-2MS.
In addition, Works2 GX (1.90U version or higher version) can be used to easily set the parameters.
Leakage current (Io), resistive leakage current (Ior).

Related supply information