LK166
Home >> Price >> MITSUBISHI >> FR-F740-3.7K-CHT
Brand sort

MITSUBISHI FR-F740-3.7K-CHT

Country: JAPAN
Name: 3 phase 400V converter
Market price: U.S.$ 658.47
(The following are the market open price not sales price!)
MITSUBISHI FR-F740-3.7K-CHT
Capacity: 4MB."Axis of control: 32.
Program language: motion SFC, special instruction.
Servo program capacity: 32K.
Location points: 6400 (indirect).
Servo amplifier connection mode: SSCNET III /H (2 system).
Suitable for a variety of purposes.
Winding material, such as film, can be put down by fixed tension .
Speed control using advanced synchronous control,
To keep the entire production line in sync FR-F740-3.7K-CHT
Workpiece position can be obtained directly from the visual system,
High speed motion control to change the position of the target in the process of operation, reduce the positioning time.
Advanced synchronous control and speed / torque control,
High speed and high precision synchronous control of various printing modules FR-F740-3.7K-CHT.
Motion SFC program.
Motion CPU module through "Function Chart Sequential", in the form of flow chart description of motion control program.
The program can be used to describe the motion CPU module of the SFC module, which is suitable for event processing,
Using motion CPU module to control a series of movements of equipment, improve the response of the event FR-F740-3.7K-CHT. "2 slots .
To install the power supply.
For QnA/A series.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centraalized sampling FR-F740-3.7K-CHT.
Cenntralized output mode .
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation FR-F740-3.7K-CHT.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
FR-F740-3.7K-CHT Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=FR-F740-3.7K-CHT&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
3 phase 400V converter
FR-F740-S90K-CHT
MITSUBISHI 3 phase 400V converter FR-F740-S90K-CHT
MITSUBISHI inverter FR-F740 series. Volt
MITSUBISHI
3 phase 400V converter
FR-F740-2.2K-CHT
MITSUBISHI 3 phase 400V converter FR-F740-2.2K-CHT
"MITSUBISHI inverter FR-F740 series. Vol
MITSUBISHI
3 phase 400V converter
FR-F740-7.5K-CHT
MITSUBISHI 3 phase 400V converter FR-F740-7.5K-CHT
"MITSUBISHI inverter FR-F740 series. Vol
MITSUBISHI
3 phase 400V converter
FR-F740-18.5K-CHT
MITSUBISHI 3 phase 400V converter FR-F740-18.5K-CHT
"MITSUBISHI inverter FR-F740 series. Vol