Input points: servo external signal 32 points, 8 axis.
Input mode: source / drain type.
Input and output points: 32 points.
Better user experience data recording function.
Easy to record, no need to program.
Simply through the special configuration tool wizard to easily complete the settings,
The collected data can be saved in CSV format to SD storage card GT16-80PSGB.
Can be effectively used to save the CSV file to facilitate the creation of a variety of reference materials,
Including daily reports, generate reports and general reports
GT16-80PSGB
These data can be applied to the data analysis, tracing, etc..
To record the change of control data without missing.
Data can be collected in a time interval or in a millisecond time interval,
To record the change of the specified control data without any omission GT16-80PSGB.
Therefore, in the event of failure, can quickly determine the cause, the precise action analysis.Servo motor series: low inertia, small capacity.
Rated output: 3.0kw.
Rated speed: 2000r/min.
Electromagnetic brake: there.
Oil seal: have.
Corresponding servo amplifier: MR-JE-10B/MR-JE-10A GT16-80PSGB.
Support position control, speed control, torque control, push and press control .
Position control can use linear, arc interpolation controller, fixed size feed control, target position change and other rich functions.
The position control and torque control are realized by switching control mode.
The gain adjustment of servo can be simply performed by the advanced one key tuning function.
At the same time, it is also able to suppress the low frequency vibration of the manipulator by the advanced vibration suppression control II,
Shorten the time to complete the positioning, so as to achieve the production of the rhythm of the shortening. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial statte display, etc GT16-80PSGB..
MITSUBIISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram GT16-80PSGB.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
GT16-80PSGB Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=GT16-80PSGB&select=5