LK166
Home >> Products >> MITSUBISHI >> A/QnA series PLC >> Substrate / extended substrate >> Extended bottom plate A52B MITSUBISHI A52B

Extended bottom plate A52B MITSUBISHI A52B

Brand: MITSUBISHI
Name: Extended bottom plate
Model: A52B
2 slots.
No need to install power.
For QnA/A series.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.

Cable 3M for the expansion of the floor, the expansion of a floor for every 1 units.Multi axis positioning controller.
Optical data communication line.
Program capacity: Max 60K step.
Input / output points: 1920 points.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of MITSUBISHI A52B A52B
The photoelectric coupler is composed of two luminous two extreme tubes and a photoelectric transistor.
Light emitting diode two: the input of a photo coupler and the change of electrical signal,
The light signal is generated by the light emitting diode, which is the same as the input signal MITSUBISHI A52B.
The working process of the input interface circuit: when the switch is closed, the diode light,
The transistor is then guided to the internal circuit and input signal under the irradiation of the light.
When the switch is off, the diode does not emit light, and the transistor is not on the way MITSUBISHI A52B. Internal circuit input signal.
It is through the input interface circuit to the external switch signal into PLC internal can accept the digital signal A52B MITSUBISHI.
Photoelectric three levels: in the light of the light signal conduction, the degree of light signal and the intensity of the light signal.
The output signal has a linear relationship with the input signal in the linear operating region of the photoelectric coupler A52B MITSUBISHI.
User program storage capacity: it is a measure of how muuch the user application can store the number of indicators A52B.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words A52B MITSUBISHI. PLC to store instructions and data in words.
General llogical operation instructions each account for 1 words MITSUBISHI A52B. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.


...More relevant models >>>>